Marks the job as the SMART folder’s end point.
After the job completes, no additional jobs in the SMART folder will be submitted and the folder is marked as complete when the jobs, which are still executing, end. Jobs remain in WAIT-SCHEDULE status if they were not submitted before the folder was marked as complete.
If jobs in the SMART folder, which were submitted before the folder was marked as complete, end OK, the folder is marked OK. Otherwise, the folder is marked as NOT-OK.
NOTE: Several end points can be defined in the SMART folder allowing it to be marked complete by different jobs in the implemented flow.
EXAMPLE: A folder has 3 jobs:
A, B and C.
B runs only if A ended Ok.
C runs only if A ended not ok.
As a result, B or C does not run and the folder never completes unless both B and C have their End folder checkbox marked indicating that these 2 jobs are the folder’s end point.
Additional information |
Description |
---|---|
Usage |
Optional |
Format |
No |
Variable Name |
Check box |