If the Control-M for SAP process was stopped and a new request for the Control-M for SAP process arrives, it starts automatically. You should note the following:
status: Indicates whether the Control-M for SAP process and the Extractor process are running or not.
change_port: Updates the TCP/IP port used by the Control-M for SAP
refresh: Refreshes the data collected from the XAL interface that is used for load balancing. If you do not run this command, the data is refreshed automatically on a daily basis.
jco: Prints the version of the SAP JCo JAR file and the version of the C library file. If one of these files is not installed correctly, an error message appears.